Guide: Nory Labour Beta
How Do Core Concepts Map to Tenzo?
Key: ✅ Supported 🚸 Work in Progress ❌ Not Supported
![]() |
![]() |
|---|---|
| Location | ✅ Locations |
| Shift (actual) | ✅ Timecards (clock-in and clock-out times) |
| Shift (planned) | ✅ Planned Shifts, costed from the scheduled cost |
| Hours | ✅ Duration |
| Employee | ✅ Employees |
| Role | ✅ Roles |
| House Part | ✅ Departments |
| Pay rate | ✅ Wage |
| Labour cost | ✅ Cost |
| Employer taxes | ✅ Employer NI |
| Pension | ✅ Pension contributions |
| Holiday | ✅ Holiday accrual |
| Overheads | ❌ Not Supported |
| Breaks | ✅ Paid breaks — sent where recorded |
| Overtime | ❌ Not Supported |
| Penalty pay | ❌ Not Supported |
| Salaried workers | ✅ Salaried employees |
| Borrowed / loaned employees | ❌ Not Supported |
| Unapproved labour | ✅ Shifts that are not approved. Not included in default labour cost or hours. Can be reported on separately in Tenzo. |
This guide covers Nory's labour data. Nory also sends inventory — purchases, usage, waste and recipe costs — which is covered in the Nory Inventory guide.
Data Ingestion
| Real-time optionally available? | ❌ |
| Default polling frequency | Every 20 minutes |
| Data retrieved on each poll | Everything sent since the previous poll |
| Historical data | All data Nory has sent us since the integration was connected |
How Do I Compare Nory Labour Data to Data in Tenzo?
Compare against your Nory labour reporting for the same date range and location. Hours, planned hours and labour cost per employee should reconcile.
Nory sends the full on-cost breakdown, so Tenzo's labour cost includes employer NI, pension and holiday accrual alongside base pay — compare against a fully-loaded figure in Nory rather than base wages alone. Actual hours come from Nory timecards, so a shift with no clock-in and clock-out has no actual hours until it is clocked. Nory sends employer NI, pension and holiday accrual as one total per employee per day, and Tenzo splits each total across that employee's shifts by shift length. Overtime is not reported separately.
